Home (Welcome) | Grand Tour | The View | Construction | Driveway | Barn |
Preparing the ground
The first step was clearing the building site. Typically trees are
bulldozed down then pushed to the side and when permitted, burned. Since
we didn't really have any place to pile the debris up, we had it all hauled
away.
The pipe sticking up is the well that had already been drilled. The house
will be located behind this pipe. There will be a pump house in front of
the pipe.
Since the house was being built on a hill, fill material had to be brought in,
watered
and compacted to obtain a level pad. One corner had to be raised as much
as four feet.